Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe

Product Details
After-sales Service: Support
Warranty: Support
Type: Seamless
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
15000000 RMB
Plant Area
>2000 square meters
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
  • Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
Find Similar Products

Basic Info.

Model NO.
API 5CT
Technique
Hot Rolled
Material
Carbon Steel
Surface Treatment
Varnishing
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Construction & Decoration, Special Purpose
Section Shape
Round
Length
R1 R2 R3
Delivery Time
15~30days
Tolerance
±10%
Thickness
Customized
Transport Package
Wrapped in Waterproof Plastic Woven Bag
Specification
3 1/2*0.254Inch
Trademark
Baowu
Origin
Shandong
HS Code
7304291000
Production Capacity
50000 Tons/Year

Product Description

Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
API 5CT K55 J55 L80 N80 Premium Connection Casing For Oil Pipe
Product Name
API 5CT K55 Premium Connection Casing For Oil Pipe
Material
Api 5ct J55 K55 N80 L80 API 5L x42 x52 x60 x70 ;  H40 C95 N80I N80 Q C-90  T-95 P110   Q-125
Size
Size 1.050" to 20"  Outside Diameter 26.67 mm to 508 mm
Standard
API5L ,  API 5CT   API 5DP
Certificates
API5L, API 5L  ISO 9001:2008,SGS, BV,CCIC
Wall thickness
2.87~16.13 MM 
Surface Treatment
Black paint, varnish, oil, galvanized, anti corrosion coatings
End Type
LTC  STC   EUE  NUE  
Pipe Ends
Under 2 inch plain end. 2 inch and above Beveled. Plastic caps (small OD) ,Iron protector (large OD)
Pipe Length
1. R1: 4.88~7.62M.
2. R2:7.62~10.36M
3.R3:10.36~14.63M
Packaging
Loose package; Packaged in bundles(2Ton Max);  bundled pipes with two slings at the both end for easy loading and discharging; End with Plastic caps; wooden cases.
Test
Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size Inspection, hydraulic testing , X-ray Test.
Application
oil pipe; gas pipe DRILL 
Advantages
1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4.Reliable forwarder, 2-hour away from port.
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe

How Does Casing Work?

Once a well has been drilled, if it is to become a production well, the well must undergo completion. While drilling a well cuts through the rock formations and allows drilling engineers to reach the reservoir below, the raw sides of the well cannot support themselves. Similar to the bones of your spine protecting the spinal cord, casing is tubing that is set inside the drilled well to protect and support the wellstream.

In addition to providing stabilization and keeping the sides of the well from caving in on themselves, casing protects the wellstream from outside contaminants, as well as any fresh water reservoirs from the oil or gas that is being produced.

Also known as setting pipe, casing a well involves running steel pipe down the inside of a recently drilled well. The small space between the casing and the untreated sides of the well is filled with cement to permanently set the casing in place.
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe

Casing A Well.

The casing is fabricated in sections, or joints, that are usually about 40 feet long and screwed together to form longer lengths of casing, called casing strings. Each end of the casing joint has male threads that are protected by cap called a thread protector until the casings are ready to be jointed. Then, a collar or coupling, composed of a short cylindrical steel pipe that is slightly larger in diameter than the joints and also has female threads, is used to connect the two male joint ends. A thread compound is used on the two ends to ensure a tight seal.

Casing is run from the rig floor, connected one joint at a time by casing elevators on the traveling block and stabbed into the previous casing string that has been inserted into the well. Hanging above the drill floor, casing tongs screw each casing joint to the casing string.

Casing is run into the well and officially landed when the weight of the casing string is transferred to the casing hangers, which are located at the top of the well and use slips or threads to suspend the casing in the well.

A rounded section of pipe with an open hole on the end, a guide shoe is connected to the first casing string to guide the casing crew in running the casing into the well. Additionally, the outside of the casing has spring-like centralizers attached to them to help position in casing string in the center of the well.

After running the casing and before the cementing the well, a used drill bit is inserted into the well via a drillstring, and drilling fluid is then circulated for a certain amount of time to remove any remaining cuttings from the well. Also wall scratchers are dispatched into the well to remove any filter cake that may have formed on the sides of the well.

A cement slurry is then pumped into the well and allowed to harden to permanently fix the casing in place. After the cement has hardened, the bottom of the well is drilled out, and the completion process continues.

Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill PipePipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe


Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
Pipe Straightener K55/J55 for Oilfield Tubing and Casing 2 7 8 Oilfield Tubing Pipe Drill Pipe
FAO

1.How long is your delivery time?


According to the quantity.Generally within 2-7 days if in stock.And 15-20 days if not in stock.

2.What is your payment terms?


A: By T/T 30% in advance ,and 70% before delivery.
B:100% L/C at sight.
C:By T/T 30% in advance,and 70% L/C at sight.

3.Do you provide samples ? Is it free?


Yes, we offer the sample for free but do not pay for the cost of freight.

4.What if the customer is not satisfied?


If there is a problem with the product,we take full responsibility.
If there is a problem in the transportation process,we will help you to solve it.

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier